Get Citation
WU Zhi, LIU Jian-Bei, QIN Zhong-Hua, WU Ling-Hui, CHEN Chang, CHEN Yuan-Bo, CHEN Ma-Li, CHEN Xi-Hui, DONG Ming-Yi, GUAN Bei-Ju, HUANG Jie, JIANG Xiao-Shan, JIN Yan, LI Fei, LI Ren-Ying, LI Xiao-Nan, LEI Guang-Kun, LIU Rong-Guang, LUO Xiao-Lan, MA Xiao-Yan, SHENG Hua-Yi, SUN Han-Sheng, TANG Xiao, WANG Lan, WANG Liang, XU Mei-Hang, ZHANG Jian, ZHANG Hong-Yu, ZHANG Yin-Hong, ZHAO Yu-Bin, ZHAO Ping-Ping, ZHU Ke-Jun, ZHU Qi-Ming and ZHUANG Bao-An. Tuning of the cosmic-ray test system of the BESⅢ drift chamber[J]. Chinese Physics C, 2010, 34(7): 983-987. doi: 10.1088/1674-1137/34/7/010
WU Zhi, LIU Jian-Bei, QIN Zhong-Hua, WU Ling-Hui, CHEN Chang, CHEN Yuan-Bo, CHEN Ma-Li, CHEN Xi-Hui, DONG Ming-Yi, GUAN Bei-Ju, HUANG Jie, JIANG Xiao-Shan, JIN Yan, LI Fei, LI Ren-Ying, LI Xiao-Nan, LEI Guang-Kun, LIU Rong-Guang, LUO Xiao-Lan, MA Xiao-Yan, SHENG Hua-Yi, SUN Han-Sheng, TANG Xiao, WANG Lan, WANG Liang, XU Mei-Hang, ZHANG Jian, ZHANG Hong-Yu, ZHANG Yin-Hong, ZHAO Yu-Bin, ZHAO Ping-Ping, ZHU Ke-Jun, ZHU Qi-Ming and ZHUANG Bao-An. Tuning of the cosmic-ray test system of the BESⅢ drift chamber[J]. Chinese Physics C, 2010, 34(7): 983-987.  doi: 10.1088/1674-1137/34/7/010 shu
Milestone
Received: 2009-08-15
Revised: 2009-09-23
Article Metric

Article Views(2556)
PDF Downloads(506)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Tuning of the cosmic-ray test system of the BESⅢ drift chamber

    Corresponding author: WU Zhi,

Abstract: The BESⅢ drift chamber and its subsystems need a cosmic-ray test after the chamber construction to check the chamber construction quality, testing the joint operation of the whole system and the performance of the chamber. The noise performance, drift time and
charge measurements, and the scanning of channels were examined specifically. The preliminary results of the test indicate that the whole system works well.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return