Get Citation
WANG Guang-Wei, SHA Peng, PAN Wei-Min, SUN Yi, LI Zhong-Quan, LIU Rong, HUANG Tong-Ming, ZENG Ri-Hua, ZHAO Guang-Yuan, HUANG Hong, XU Yu-Fen, MA Qiang, LIN Hai-Ying, XU Bo and WANG Qun-Yao. Construction of the BEPCⅡ RF System[J]. Chinese Physics C, 2008, 32(S1): 169-171.
WANG Guang-Wei, SHA Peng, PAN Wei-Min, SUN Yi, LI Zhong-Quan, LIU Rong, HUANG Tong-Ming, ZENG Ri-Hua, ZHAO Guang-Yuan, HUANG Hong, XU Yu-Fen, MA Qiang, LIN Hai-Ying, XU Bo and WANG Qun-Yao. Construction of the BEPCⅡ RF System[J]. Chinese Physics C, 2008, 32(S1): 169-171. shu
Milestone
Received: 2008-01-10
Revised: 1900-01-01
Article Metric

Article Views(2958)
PDF Downloads(842)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Construction of the BEPCⅡ RF System

    Corresponding author: WANG Guang-Wei,

Abstract: The RF system for the Beijing Electron Positron Collider Upgrade (BEPCⅡ) Project had been working since Nov, 2006. It consists of 3 subsystems including the superconducting cavity, the klystron and the low level RF system. Compared with the former RF system, the operating frequency has been changed from 200MHz to 499.8MHz, and the superconducting cavity has been used to replace the normal cavity. Up to now, the RF system performance is good and achieves the designed target.

    HTML

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return