[1] |
Jian-Yong Zhang
, Xiao Cai
, Xiao-Hu Mo
, Di-Zhou Guo
, Jian-Li Wang
, Bai-Qi Liu
, M. N. Achasov
, A. A. Krasnov
, N. Yu. Muchnoi
, E. E. Pyata
, E. V. Mamoshkina
, F. A. Harris
. Upgrade of beam energy measurement system at BEPC-Ⅱ. Chinese Physics C,
2016, 40(7): 076001.
doi: 10.1088/1674-1137/40/7/076001
|
[2] |
CAI Xiao
, FU Cheng-Dong
, MO Xiao-Hu
, QIN Qing
, WANG Yi-Fang
, ZHANG Jian-Yong
. A scenario for high accuracy τ mass measurement at BEPC-Ⅱ. Chinese Physics C,
2012, 36(7): 573-577.
doi: 10.1088/1674-1137/36/7/001
|
[3] |
SUI Yan-Feng
, WANG Lin
, ZHAO Ying
, YUE Jun-Hui
, LI Xiao-Ping
, CAO Jian-She
, MA Li
. BEPCⅡ wire scanner system. Chinese Physics C,
2010, 34(10): 1661-1664.
doi: 10.1088/1674-1137/34/10/021
|
[4] |
LIU Yu-Dong
, YUE Jun-Hui
, WANG Na
. Studies on electron cloud instability in BEPCⅡ. Chinese Physics C,
2009, 33(S2): 71-74.
doi: 10.1088/1674-1137/33/S2/018
|
[5] |
ZHANG Chuang
. BEPCⅡ: construction and commissioning. Chinese Physics C,
2009, 33(S2): 60-64.
doi: 10.1088/1674-1137/33/S2/016
|
[6] |
QIN Qing
, HUANG Nan
, LIU Wei-Bin
, LIU Yu-Dong
, PENG Yue-Mei
, QIU Jing
, WANG Dou
, WANG Xin-Hao
, WANG Na
, WANG Jiu-Qing
, WEI Yuan-Yuan
, WEN Xue-Mei
, XING Jun
, XU Gang
, YU Cheng-Hui
, ZHANG Chuang
, ZHANG Yuan
, ZHAO Zheng
, ZHOU De-Min
. Beam dynamics studies on BEPC-Ⅱ storage rings at the commissioning stage. Chinese Physics C,
2009, 33(S2): 65-70.
doi: 10.1088/1674-1137/33/S2/017
|
[7] |
BIAN Wen-Long
, YUAN Ping
, MA Li-Zhen
, HE Yuan
, LI Qing
, WU Wei
, YAO Qing-Gao
. Stress Analysis of CR Superferric Magnet. Chinese Physics C,
2008, 32(S1): 11-14. |
[8] |
WU Wei
, HE Yuan
, MA Li-Zhen
, LI Qing
, YAO Qing-Gao
, BIAN Wen-Long
, XIA Jia-Wen
. 3D Quench Simulation Using Finite Element Method for CR Superconducting Magnet's Strand. Chinese Physics C,
2008, 32(S1): 15-18. |
[9] |
LI Gang
, ZHAO Ji-Jiu
, WANG Ke-Xiang
, YUE Ke-Juan
. Research of Cryogenic Control System at BEPCⅡ. Chinese Physics C,
2008, 32(S1): 83-85. |
[10] |
SHI Cai-Tu
, NI Gan-Lin
, SUN Xian-Jing
, CAO Zan
, YIN Zhao-Sheng
, PANG Jia-Biao
, CHEN Wan
, LI Li
, CHEN Fu-San
, PENG Quan-Ling
, YIN Bao-Gui
, ZHANG Zhuo
, SUN Yao-Lin
, WANG Jian-Li
, ZHANG Jia-Fei
. Design and Fabrication of the Magnets for BEPCⅡ Project. Chinese Physics C,
2008, 32(S1): 7-10. |
[11] |
WANG Chun-Hong
, WANG Xiao-Li
, LIU Jia
, SHI Hao-Li
, GAN Quan
, LIU Shu
, ZHAO Ji-Jiu
. BEPCⅡ Magnet Power Supply Control System. Chinese Physics C,
2007, 31(1): 91-95. |
[12] |
GEN Zhe-Qiao
, HOU Mi
, PEI Guo-Xi
. PAD Design for the Phasing System of BEPCⅡ Linac. Chinese Physics C,
2006, 30(2): 151-154. |
[13] |
LIU Bo
, GU Meng-Ping
, WANG Shu-Hong
, CHI Yun-Long
, YANG Xing-Wang
, TIAN Shuang-Min
, LIU Wei-Bin
, YE Qiang
. Experiment and Operation of BEPCⅡ Electron Gun System. Chinese Physics C,
2006, 30(5): 466-469. |
[14] |
ZHAO Feng-Li
, HOU Mi
, ZHAO Yan-Ping
, LIU Jin-Tong
, ZHANG Jing-Ru
, ZHOU Yao-Xiang
, HAN Da-Wei
. Microwave System for BEPCⅡ-Linac. Chinese Physics C,
2006, 30(2): 155-158. |
[15] |
ZHAO Ji-Jiu
, WANG Chun-Hong
, LEI Ge
, GAO Wen-Chun
, WANG Xiao-Li
, LI Gang
, YUE Ke-Juan
, ZHAO Zhuo
, LIU Jia
, XU Shi-Fu
, HUANG Song
, XUE Peng
, KONG Deng-Ming
, MA Mei
, WANG Jin-Can
, XU Guang-Lei
. BEPCⅡ Control System. Chinese Physics C,
2006, 30(11): 1100-1106. |
[16] |
WANG Chun-Hong
, LIU Jia
, ZHAO Ji-Jui
. The Control System Reconstruction for 4W1 Magnet Power Supply in BEPC. Chinese Physics C,
2005, 29(10): 997-1001. |
[17] |
YUAN Ren-Xian
, YUE Jun-Hui
, CAO Jian-She
, MA Li
. Simulation of BEPCⅡ′s BPM. Chinese Physics C,
2004, 28(6): 664-668. |
[18] |
Qi Xiangrong
, Chen Jiangchuan
, Hu Haiming
, Hu Tao
, Huang Guangshun
, Ju Xin
, Li Jin
, Li Xinhua
, Mao Zepu
, Xue Shengtian
, Zhao Zhengguo
, Zheng Zhipeng
, Zhou Li
. Study and Simulation of the Features of Hadronic Events in the BEPC Energy Region. Chinese Physics C,
1999, 23(1): 1-9. |
[19] |
Ma Li
, Shi Ping
, Ye Kairong
. Upgrade of BPM System for the BEPC Storage Ring. Chinese Physics C,
1998, 22(5): 475-480. |
[20] |
Pei Guoxi
, Xie Jialin
, Zhou Shu
, Sun Songlan
. Optimization of the BEPC Positron Source. Chinese Physics C,
1990, 14(S2): 125-134. |