Installation and cosmic ray test of the high voltage system of the BESⅢ drift chamber

Get Citation
XU Mei-Hang, CHEN Chang, CHEN Yuan-Bo, WU Zhi, QIN Zhong-Hua, WU Ling-Hui, LIU Jian-Bei, WANG Lan, JIN Yan, LIU Rong-Guang, ZHU Qi-Ming, ZHANG Jian and HUANG Jie. Installation and cosmic ray test of the high voltage system of the BESⅢ drift chamber[J]. Chinese Physics C, 2008, 32(12): 992-994. doi: 10.1088/1674-1137/32/12/010
XU Mei-Hang, CHEN Chang, CHEN Yuan-Bo, WU Zhi, QIN Zhong-Hua, WU Ling-Hui, LIU Jian-Bei, WANG Lan, JIN Yan, LIU Rong-Guang, ZHU Qi-Ming, ZHANG Jian and HUANG Jie. Installation and cosmic ray test of the high voltage system of the BESⅢ drift chamber[J]. Chinese Physics C, 2008, 32(12): 992-994.  doi: 10.1088/1674-1137/32/12/010 shu
Milestone
Received: 2008-03-26
Revised: 2008-04-16
Article Metric

Article Views(4406)
PDF Downloads(725)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Installation and cosmic ray test of the high voltage system of the BESⅢ drift chamber

    Corresponding author: XU Mei-Hang,

Abstract: 

After examination of the designed high voltage power supply system of the BESⅢ drift chamber in the beam test of the full length prototype of drift chamber, a full system covering all the channels of high voltage was installed. The system's training and the high voltage value adjustment were carried out in the cosmic ray test of the BESⅢ drift chamber. The cosmic ray test for the full system and its final installation on the BESⅢ drift chamber were reported. The full system of high voltage power supply works stably and reliably.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return