RF Power Test and Conditioning of the New Accelerating Structures for the BEPCII-Linac
- Received Date: 2004-06-01
- Accepted Date: 1900-01-01
- Available Online: 2005-01-05
Abstract: The beijing electron Positron collider upgrade Project (bePcⅡ) requires its injector linac to upgrade the beam energy and current. thus the accelerating structures in the positron production region must be newly designed and constructed to meet the high gradient demand. these new structures must be tested and conditioned with the high rf power before their installation into the linac tunnel. this paper describes the design and construction of the high power rf test stand, the tuning of the rf power source, the progress and the final results of the rf test and conditioning.





 Abstract
Abstract HTML
HTML Reference
Reference Related
Related PDF
PDF 
	                     
						











 DownLoad:
DownLoad: