Time Drift Stabilizer Unit in BEPCⅡ Injection Kicker System
- Received Date: 2008-01-09
- Accepted Date: 1900-01-01
- Available Online: 2008-01-04
Abstract: High time-stability performance of the injection kicker system is important for the Beijing Electron Positron Collider Upgrade Project (BEPCⅡ), with jitter and drift less than ±5ns. In order to compensate the delay time drift of thyratron on the kicker pulsed power supply, a drift stabilizer is developed. The test results meet the demand of design by regulation resolution=1ns, jitter+drift <2ns in 8 hours. The detailed design of the time-drift stabilizer will be described in this paper.





Abstract
HTML
Reference
Related
PDF












DownLoad: